BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Talks.cam//talks.cam.ac.uk//
X-WR-CALNAME:Talks.cam
BEGIN:VEVENT
SUMMARY:Structures Construction of Precast Segmental Viaducts in Hong Kong
  - Mungo Stacy (Parsons Brinckerhoff)
DTSTART:20061117T160000Z
DTEND:20061117T170000Z
UID:TALK5948@talks.cam.ac.uk
CONTACT:Nami Norman
DESCRIPTION: Construction of Precast Segmental Viaducts in Hong Kong: This
  presentation will look at the practical aspects of designing and building
  2km of \nprecast segmental viaduct from the contractor's perspective.  As
 pects touched on will include alignment control (how to make it meet in th
 e middle)\,\nvalue engineering (a bridge with no bearings) and communicati
 on (in Cantonese).  This is the story of the two years I spent on site bet
 ween 2003-2005\,\nacting as design representative for my employer\, struct
 ural engineering firm Benaim.
LOCATION:Engineering Department - LR3
END:VEVENT
END:VCALENDAR
